Beyond Gravity Circle, Zürich

In the world of modern architecture and building technology, there are always new challenges to be faced. Take, for example, a project involving 14,000 running metres of the OPTI Y high performance module – a demanding task we swiftly accomplished.

Particular flexibility was also required as the architect wanted a radiant ceiling system that could be well integrated but also adapted at a later stage for room partitions.

Our OPTI Y radiant ceiling system was able to meet all of these requirements and proved the perfect solution. In particular, this system made it possible to cut the inactive modules to size and, for example, subsequently integrate fire dampers, lighting and other elements. This meant the flexibility of the space could be maintained without impacting the functionality of the radiant ceiling.

Year: 2023
Contact us